Highway Structural Maintenance (HSM) and Bridge Assessment and Strengthening (BAS): Progress on 2010/11 Schemes and 2011/12 Programmes

Report of the Executive Director of Environment, Economy and Culture

Please note that the following recommendations are subject to consideration and determination by the Cabinet (and confirmation under the provisions of the Council's Constitution) before taking effect.

Recommendations: It is recommended that:

(a) progress on 2010/11 schemes detailed in Appendices I and II to this report be noted;

(b) the strategy for delivery of the 2011/12 HSM/BAS programmes as described in this report and set out in Appendices III and IV be approved;

(c) detailed allocation of the available budget to schemes on principal and non-principal roads be determined by the Executive Director of Environment, Economy and Culture on the basis of priorities identified from technical surveys and inspections, the recovery strategy, and within the limits of the approved budget;

(d) authority to amend the programme to maximise the impact of the programme be delegated to the Executive Director of Environment, Economy and Culture, within the agreed policy guidelines subject to the approval of the Cabinet Member for Highways and Transportation for any budget changes to individual schemes exceeding 25,000.

1. Summary

This report covers Highway Structural Maintenance (HSM) and Bridge Assessment and Strengthening (BAS), giving a progress report for 2010/11 and outlining the programme for 2011/12. The report also gives an indication of the technical assessment methods which have been used to determine how the funding should be allocated.

2. Background

(i) Since 1992 HSM and BAS has been funded as part of the supported capital programme.

The HSM and BAS programmes have the objectives of achieving sustainable maintenance of strategic routes and strengthening the highway to carry 44 tonne vehicles, which have been allowed to travel on the country's roads since 1999. Targeting and carrying out this maintenance effectively and efficiently, whilst integrating policies for freight, public transport, walking and cycling, will enable the County Council to demonstrate that it applies the principles of good asset management to all its highway and transport assets that are needed to meet the objectives of the Devon Local Transport Plan (DLTP). A well maintained highway network is an essential requirement for the successful delivery of Devon County Council's Strategic Plan 2009 - 2013, in particular the pledges to reduce the number of potholes by 30%, and maintain 96% of A roads and 90% of B roads in good condition, by 2013. The ability to efficiently transport people and goods around the County underpins Devon's economy and has a direct impact on the quality of our environment.

In recognition of their importance to the economy, the strategy first gave emphasis to principal roads, but from 2003 the non-principal road recovery programme was designed to address the considerable challenge of maintaining the 11,800 km of non principal classified and unclassified roads in the County in a way that was affordable and would meet the objectives of the DLTP.

(ii) The Devon Citizen's Survey indicates that the standard of maintenance on some parts of the network still falls below the reasonable expectation of road users.

(iii) The last two winters (and this one so far) have been more severe in terms of adverse weather events than any in the last 30 years. The effects are felt not just in the cost of dealing with the events as they arise in their immediate aftermath but also in serious ongoing attrition of the surface and structure of the County's highways. Members will already have observed an increase in potholes breaking out. With waterlogged and frozen ground and continuing low temperatures this problem is expected to increase substantially over the next few months. The current year's maintenance budgets have been put under great strain as a result of this year's weather. Its consequences will continue to cause severe problems in 2011/12.

(iv) The reduction in the 2011/12 revenue maintenance budget has a significant implication for planned and preventative maintenance, and this will impact on the work delivered via this capital allocation.

(v) Every year an assessment is made of relative maintenance priorities to determine minimum funding for essential services. The detailed allocations are made on a relative needs basis using inventory information and taking account of highway condition survey data from the Council's Pavement Management System.

3. Strategy

(i) The condition of roads is assessed using best value performance indicators specified by Government and local performance indicators. Road surface condition is measured using the SCANNER (Surface Condition of the National Network of Roads) device which detects defects like rutting, cracking and bumpiness. This is the current state of the art in automated road condition surveys. The score processed from the survey estimates the percentage of the network requiring maintenance and is the basis of the reporting of the National Indicators, as shown in Table 1 below.

Skidding resistance is another factor that has an influence on road safety. Table 1 also includes the local indicator for Principal roads where skidding resistance does not need to be investigated.

Table 1 Summary of Condition of Classified Roads

Indicator

2005/06

%

2006/07

%

2007/08

%

2008/09

%

2009/10

%

Provisional 2010/11

%

NI 168 SCANNER Principal Roads Percentage of the network requiring treatment

6

6

4

4

5

4

NI 169 SCANNER Non Principal Classified Roads Percentage of the network requiring treatment

8

15

10

10

14

14

Local Indicator SA2(b) Skidding resistance Percentage of the Principal Road network where skidding resistance does not need to be investigated.

80

83

79

90

93

96

(ii) Devon's Strategic Plan 2009-2013 includes the following pledges:

to reduce the number of potholes by 30% by 2013 (baseline 2010);

96% of A roads and 90% of B roads will be in good condition by 2013.

Currently, approximately 130,000 potholes that are considered to be a potential safety defect have been found this year (since 1st April 2010). Recent events indicate that this will be significantly exceeded by year end. A reduction of 30% in the number by 2013 would require significant maintenance work of both a reactive and preventative nature, mainly in the form of permanent pothole repairs, patching and surface dressing work.

(iii) The combination of revenue budget reductions, construction inflation and the effect of the severe weather mean that the County Council will face significant challenges to its ability to manage the network in the coming year. The examination of relative priorities indicates a series of pressures. Although, where possible and appropriate, certain maintenance operations formerly funded from revenue will be financed from the capital settlement for highway structural maintenance, it must be remembered that this capital allocation is expected by the Department for Transport to be additional to highway authority revenue budgets and not used as an alternative. Nevertheless, pressure on the revenue budget forces the proposal to finance all reconstruction, surfacing, surface dressing and some patching from capital, leaving some planned patching as the only structural maintenance funded from revenue.

The strategic pledge relating to the condition of A & B roads will be addressed by implementing suitable annual programmes of structural maintenance works. The choice of treatment and location of the works will be selected by applying good asset management principles, using the Council's Pavement Management System to achieve best value for money in enabling the Council to help to meet its pledges and also manage the condition of the rest of the network.

Long term investment needs to achieve defined outcomes in terms of the condition of Devon's highway network and have been calculated by using a financial model developed by the Council's consultants, WDM Ltd. To summarise, it shows that an average annual investment of 50-60 million would be required for all types of structural maintenance (resurfacing and strengthening) to maintain all classes of road in the same condition as they are now, expressed as the percentage of A, B, C class and unclassified roads in need of repair. This is clearly considerably in excess of the amount the Council has available for the purpose now or in the foreseeable future.

With an average annual spend on road structural maintenance at a more realistic level of approximately 30 million, at 2010 prices, over the 15 years of Devon's third Local Transport Plan, 2011 2026 (in line with the actual 2010/11 spend) the money left after funding the pledge for A and B roads will be insufficient to prevent a significant deterioration in C class and unclassified (U/C) roads.

Table 2 Summary of Investment Required for Classified Roads

Length

(km)

2011 condition indicator:

Percentage in need of repair or condition "red"

Average annual investment million

2026 condition indicator:

Percentage in need of repair or condition "red"

A roads

969

4

6

4

B roads

663

5

3

5

C roads

4,512

16

11

30

U/C roads

6,688

20*

10

30+

*Estimated from a sample SCANNER condition survey

(iv) The Cumbrian floods alerted all local authorities to the strategic importance of highway bridges and structures, their contribution to maintaining communities, and their potential vulnerability when subject to extreme conditions. This has highlighted the need to ensure that limited budgets are focussed on key areas, through effective asset management.

Significant progress has been made in gathering data as part of the Transport Asset Management Plan, enabling prioritisation of project work on structures to be identified in most areas. An increasing amount of data has now been gathered relating to the condition of the County's highways structures both bridges and more recently retaining walls. The condition of these structures is determined in accordance with national guidelines for inspection and assessment resulting in the calculation of an overall Structure Stock Condition Performance Indicator (SSCPI). The current condition of highway structures based on information collected to date is set out below.

Table 3 Summary of Condition of Bridges and Structures

Condition

SSCPI category

Poor

Fair

Good

Excellent

SSCPI range

40 to 64

65 to 84

85 to 94

94 to 100

Average score of Bridges stock

92

Average score of Retaining Walls stock

70

This has highlighted the disparity between the general condition of bridges and retaining walls, and has influenced the decision to prioritise budgets to improve the condition of retaining walls over the coming years in order to address this imbalance. The Asset Management Plan, currently under development, will set service levels for both individual structures and the structure stock as a whole. Currently, repairs are required to 1,455 retaining walls and 689 bridges to raise them to the 'Good' category.

The key priority in recent years has been to ensure that all structures on the principal road network are assessed and considered for upgrading to meet the 44 tonne gross vehicle weight capacity. Strengthening works to bridges on lesser categories of highway are being prioritised to be consistent with the maintenance principles adopted for the whole highway network. Currently 240 bridges have some strength deficiency and, where appropriate, are being managed using a risk-based approach.

With extreme weather events, particularly flooding, becoming more frequent there is an increasing need to carry out scour protection works to structures. Flood resilience has been enhanced at 8 vulnerable bridges during 2010 and the programme of prioritisation and protection will continue.

Work continues on the assessment of older structures, predominantly arches, where historic definitions of load bearing capacities have come into question following changes in design standards. These structural assessments are necessary to help identify and prioritise essential works and to best maintain and improve the condition of the bridge stock, and include a number of County-owned bridges spanning live railways.

The programme arising from the risk ranking of all bridge parapets continues with mitigation works on high priority sites due for completion this year and further sites programmed for next year. This includes protection works at road/rail proximity sites in conjunction with Network Rail.

A renewal and maintenance programme has been put in place as a result of last year's programme to inspect and assess essential bridge components, particularly bearings and joints.

4. Analysis

(i) Principal Roads

Within the Council's Strategic Plan 2009 - 2013, there is a pledge to maintain 96% of 'A' (principal) roads in good condition. This equates to a target for the national indicator, NI 168, for the proportion of principal roads where maintenance should be considered of 4%, which is to say a network that is not perfect but is in steady state and generally fit for purpose, meeting user expectations. Condition has been stabilised at this level, enabling more money to be invested in the non principal roads, where the need is also apparent. However, with 26% of the principal network in condition "amber" as measured by the SCANNER surveys, that is, showing some signs of deterioration but not yet in need of major maintenance, continued investment and careful management will be required to ensure this performance can be achieved and sustained.

On Principal roads, the recovery strategy takes account of safety, serviceability and strength. The highest priority is given to safety, indicated by deficient skid resistance, and eradicating failed areas helps the Council to meet DLTP Objective 3 'Making roads safer'.

The prioritisation of schemes is based on a Value for Money Index which has been developed to take account of the effectiveness of the schemes in helping to achieve the overall road condition performance targets.

A key aim is also to be able to increase the proportion of preventative rather than reactive maintenance works undertaken, providing best value in the longer term. During 2010/11 the Council continued a preventative maintenance strategy on principal roads, allocating 1.95m to preparatory patching and surface dressing. SCANNER data is being used to target sites where surface dressing can provide a cost effective remedy to immediate defects and enhance the longer term life of the road pavement improving skidding resistance and sealing to prevent ingress of water, and help to further stabilise NI168.

(ii) Non Principal Roads

On non-principal classified roads (B and C roads) the 2009/10 SCANNER survey showed that 14% should be considered for planned maintenance soon (NI169). Non-principal classified roads comprise both B and C roads and the survey shows that 5% of B roads and 16% of C roads should be considered for maintenance. The 5% performance on B roads equates to 95% in good condition, which exceeds the Council's target for such roads in the Strategic Plan of 90%.

The Non Principal Road Recovery Strategy has been used to target important routes to settlements of over 500 population and linking communities, roads serving industrial estates, urban local distributor routes, and pre-salting routes not covered by the above. Since 2003/04 over 1,000 schemes covering 830km of carriageway have been completed. This strategy is helping to deliver a Strategic Plan objective of "connecting with the Devon Communities", and will complete the link with winter service objectives, and the strategic target for B roads.

This strategy has so far tended to concentrate efforts on the non-principal classified network and limited funds have been available for structural maintenance on the rest of the minor road network. The reactive defect repair regime and adherence to the cyclical maintenance regime keeps the unclassified network usable, safe and generally fit for purpose, although this will be difficult to sustain with the revenue reductions. Where these routes are suitable for surface dressing this type of repair will be undertaken in association with the required preparatory patching.

The strategy above will continue to be developed and will be subject to some local flexibility and "common sense" variation to treated lengths.

5. HSM and BAS Programmes 2010/11

The HSM and BAS LTP settlement for 2010/11 was 31.789 million. 257k for repair works on the A361/A39 North Devon Link/Atlantic Highway, was also brought forward from 2009/10.

Appendix I shows progress with the HSM programme for 2010/11.

Appendix II shows progress with the BAS programme for 2010/11.

6. HSM and BAS Programmes for 2011/12

Devon's allocation for 2011/12 is 36.833 million.

It is proposed to allocate the available funding to HSM and BAS as outlined in Appendix III and Appendix IV.

This includes:

(i) HSM Principal Roads:

6.7m to specific larger schemes with a high Value for Money Index. These schemes will rectify 30.4km of carriageway with potential skidding defects and problems identified by the SCANNER survey.

3.3 on surface dressing and preparatory patching works. This will surface dress 75km of carriageway in 2011/12 and prepare for the 2012 dressing programme.

Both will target "red" and "amber" SCANNER data and help to further stabilise NI168 and contribute to the County Council's Strategic Plan pledges.

(ii) HSM Non-Principal Roads:

15.6 million has been allocated to make further progress on the Non Principal Road Recovery Strategy and to undertake preparatory patching and surface dressing on local roads to compensate for reductions that have had to be made in the 2011/12 revenue budget for this type of work, as detailed in a separate report to the Cabinet. This will help support the adjustment in the maintenance functions in the revenue budget and will aid NI 169 by treating carriageway with high levels of red and amber SCANNER defects and improve their surface condition.

(iii) Footways

Due to revenue budget restrictions general upgrades to footways will be only those funded by the allocation in this budget. Footways will be kept in a condition that is reasonably safe and commensurate with established usage.

(iv) Structures

Key elements of the 2011/12 BAS programme include:

Works valued at 700,000 will complete the contract to strengthen a retaining wall and cantilevered walkway adjacent to the A386 near Bideford Longbridge.

Further works valued at 1,085,000 are proposed as part of an ongoing programme to replace or strengthen highway retaining walls in order to address the disparity between the relatively good condition of the County's bridges and moderate condition of its retaining walls supporting the highway.

The replacement programme for limited life components of more modern bridges including bearings and movement joints will continue to be implemented especially for bridges on the A361 North Devon Link Road.

The asset management of all highways structures will continue to be developed by gathering further data and carrying out structural assessments in order to obtain a more detailed knowledge of the condition of the asset, and to allow a more integrated approach to prioritisation to be taken for the whole highway network.

(v) Street Lighting and Traffic Signals

A replacement programme for streetlight columns which have deteriorated through age will continue in association with work to reduce carbon footprint generated by Devon's streetlights, however, due to limited funding such work will be prioritised and there may be instances where deteriorated columns are removed and not replaced until such time as funding becomes available. The opportunity will be taken, where possible, to switch lanterns to part night lighting after consultation with Members and the police.

A significant proportion of Devon's traffic signal equipment is approaching the end of its design life, and the Transport Asset Management Plan will programme its replacement. This will include the use of LED signal aspects, and extra low voltage systems, which have the benefits of greater light integrity, reduced power consumption, and consequently reduced revenue expenditure and carbon emissions.

7. Sustainability Considerations

When maintenance work is undertaken it is managed to ensure that the effect on the surrounding environment is kept to a minimum. On carriageways, surface treatment and reconstruction work is tightly controlled to achieve long term durability. Recycled materials and secondary aggregates are used whenever possible and a recycling strategy has been adopted to promote this. A specific programme of recycling work was completed in 2010/11 and this will continue. All planings will be reused in the County's highway network. When surfacings incorporating primary materials are required, a durable low noise material such as stone mastic asphalt is considered.

8. Equality Considerations

No direct implications due to the capital budget at this time, but see the revenue report (EEC/11/37/HQ) for implications following the reduction in revenue budgets.

9. Legal Considerations

No direct implications at this time.

10. Risk Management Considerations

The proposals contained in this report have been assessed and all reasonable actions are taken to safeguard the Council's position.

The reduction in the revenue budget has significant implications for this capital allocation. Inability to undertake enough planned and general preventative maintenance work will result in an increased depreciation to the highways asset. This will lead to increased deterioration and defects and as a consequence safety will be compromised and third party claims may increase.

Where risks have been identified such as those associated with cost inflation or inclement weather, which could disrupt the capital programme by causing higher than anticipated costs or delays respectively, the implications have been taken into account in preparing this report. This includes the provision for reasonable contingencies in the estimates for capital highway and bridge maintenance schemes.

The corporate risk registers have been updated as appropriate.

11. Options

The programme for 2011/12 optimises the use of the available funding to maximise repair work on the network. Any reduction in the programme would further compromise the County Council's ability to maintain the network in a reasonably safe condition and work towards the objectives of the DLTP, and the Council's Strategic Plan.

12. Reasons for Recommendation/Conclusion

The DfT capital settlement for 2011/12 provides funding at appropriate levels to achieve the long term plan and gives further opportunity to help address the current backlog of outstanding highway maintenance work on both Principal and non Principal roads. However, this must be seen as the continuation of a recovery programme towards a return to steady state maintenance on all routes serving the communities of Devon. It is also important that the capital funding for highway maintenance from central government is supported by a robust revenue allocation, as the commitment by the County Council is being monitored in this respect and could influence future capital settlements.

Chris McCarthy

Electoral Divisions: All

Cabinet Member for Highways and Transportation,

Councillor Stuart Hughes

Local Government Act 1972: List of Background Papers

Contact for enquiries: Lester Willmington

Room No: AB1, Lucombe House, County Hall, Exeter

Tel No: (01392) 383379

Background Paper

Date

File Ref.

1.

Devon Local Transport Plan 2006-2011

July 2006

-

-

2.

Devon PMS and Condition Data

mb180211cba

hak/highway structural maintenance

06 hq 280211


Appendix I

To EEC/11/36/HQ

Highway Structural Maintenance Programme 2010/2011

Road No

Scheme Name

County Electoral Division

Scheme Total '000

Comments

Commitments/contract retentions

200

A3123

Lynton Cross to Berrydown Cross

Combe Martin Rural

442

Completed

A386

Knapp House

Northam

75

Completed

A386

Torridge Hill to Ford Rise

Bideford East

71

Programmed March 2011

A388

Stibb Cross

Torrington Rural

40

Completed

A388

Woodford Bridge

Holsworthy Rural

69

Completed

A388

South of West Stibb Farm

Torrington Rural (60%)/Holsworthy Rural (40%)

56

Completed

A388

Forestreet

Bideford South & Hartland

100

Completed

A399

Four Cross Way to Mockham Down Gate

Chulmleigh & Swimbridge (90%)/ South Molton Rural (10%)

682

Completed

A399

Mockham/Shutscombe/Brayford

Chulmleigh & Swimbridge (50%)/ South Molton Rural (50%)

250

Completed

A399

Newtown Bridge

South Molton Rural

28

Completed

A3072

Halsegate Cross

Hatherleigh & Chagford

53

Completed

A388

Mount Lane to Blagdon Cross

Holsworthy Rural

87

Completed

A386

Whites Lane to Limers Hill

Torrington Rural

30

Design ongoing, works deferred to 11/12 for co ordination reasons

A361

Dean Cross to Score Lay By

Combe Martin Rural/Ilfracombe

515

Completed

A377

Blackboards

Torrington Rural

235

Completed

A3124

South Nethercott Farm

Hatherleigh & Chagford

153

Completed

A3072

Hatherleigh Roundabout

Hatherleigh & Chagford

55

Completed

A377

Kingford

Chulmleigh & Swimbridge

235

Programmed Feb 2011

A361

Gornhay

Tiverton West

15

Design ongoing, works deferred to 11/12 due to ongoing negotiation

A3015

Wilton Way Rbt to Moor Lane Rbt

Heavitree & Whipton & Barton

0

Deferred to 2012/13

A377

Alphington Cross and Spur

Alphington & Cowick

200

Due for completion February 2011

A376

Clyst St George Rbt

Broadclyst & Whimple

29

Completed

A376

George & Dragon Rbt

Broadclyst & Whimple

21

Completed

A376

Clyst St Mary Rbt

Broadclyst & Whimple

82

Completed

A377

St Andrew's Road to Three Horseshoes

Broadclyst & Whimple

99

Completed

A375

Radway to Peaslands Road

Sidmouth Sidford

97

Programmed March 2011

A377

Lapford Cross to Railway Cottages

Newton St Cyres & Sandford

236

Completed

A3072

Bow (West Edge) to Nicholls Nymett Cross

Newton St Cyres & Sandford (25%)/Crediton Rural (25%)/Hatherleigh & Chagford (50%)

522

Completed

A377

Red Cow

St David's & St James

42

Completed

A377

Morchard Road to Bury Bridge

Newton St Cyres & Sandford

181

Completed

A373

Dulford

Honiton St Paul's

180

Completed

A358

Tytherleigh (Fordwater Farm)

Axminster

75

Completed

A358

Tytherleigh (Broom Lane)

Axminster

27

Completed

A358

First Avenue to Weycroft Farm

Axminster

40

Completed

A358

Weycroft Bridge to Weycroft Manor Farm

Axminster

40

Completed

A358

Smallridge Road north for 270m

Axminster

46

Cancelled

A38

Culmstock Cross

Willand & Uffculme

105

Completed

A396

Ashley Rise

Tiverton West

56

Completed

A361

Uplowman Bridge to Junction 27

Willand & Uffculme/Tiverton East

273

Programmed March 2011

A379

The Retreat to Swans Nest road

Exminster & Kenton

78

Completed

A379

Lower Marsh Row

Exminster & Kenton

102

Completed

A379

Labrador Bends

Teign Estuary

300

Completed

A381

Two Mile Oak

Teignbridge South

138

Due for completion February 2011


A379

Between Stoliford Farm & Harraton Cross

Yealmpton

6

Majority of scheme re evaluated, current condition acceptable, monitoring to continue

A379

Modbury Village

Yealmpton

297

Ongoing, due for completion March 2011

A380

Penn Inn Rbt

Newton Abbot South (75%)/Newton Abbot North (25%)

270

Completed

A381

Penn Inn to Station Road

Newton Abbot North

64

Completed

A379

Kenton

Exminster & Kenton

287

Completed

A379

Exminster turning to Matford Roundabout

Exminster & Kenton

160

Completed

A383

Highweek

Newton Abbot North

140

Completed

A3122

Hemborough Post to West Norton Farm

Dartmouth & Kingswear (50%)/Kingsbridge & Stokenham (50%)

500

Completed

A3121

Modbury Cross to Kitterford Cross

Yealmpton

80

Due for completion March 2011

A3121

Kitterford Cross to Haredon Cross, Ugborough

Yealmpton

383

Completed

A3121

Lower Ludbrooke Cottages to Erme Bridge

Yealmpton

508

Completed

A379

Goutsford Gate to Modbury Cross

Yealmpton

203

Completed

A381

East Street

Newton Abbot North (50%)/Newton Abbot South (50%)

49

Completed

A379

Landcombe Cove

Kingsbridge & Stokenham

43

Due for completion February 2011

A380

Penn Inn to Aller Brake Rd

Newton Abbot South

248

Due for completion February 2011

Principal Roads

Local Reconstruction, Resurfacing, Overlay, Patching

1,050

Surface Dressing

1,004

Patching Pre 11/12 Surface Dressing

951

Treatment of sites with low Skid Resistance

661

Non-Principal Roads

Non-Principal Road Recovery Programme

4,500

Local Reconstruction, Resurfacing, Overlay, Patching

0

Surface Dressing 10/11

5,131

Pre Patching for Surface Dressing 10/11

3,058

Exeter Micro Asphalt Programme

284

Deep Recycling

500

C784 Loxbeare Vehicle Restraint System

27

Capitalised Revenue

421

All Roads

Wet/Dry accident sites:

13

Apply high skid resistance surface to approaches to railway and pedestrian crossings

132

Carriageway Condition Surveys

325

Forward Design and Investigation

250

Material Testing

70

Contract Administration and Supervision

550

TAMP

134

Towns, Villages and Rural Communities Programme

0

Footways and Estates Programme (LPSA2)

0

Drainage & Flooding

0

Street Lighting Columns and traffic signals

500

Additional Patching

1,681

HIGHWAY STRUCTURAL MAINTENANCE PROGRAMME

Total

30,840


LTP Settlement

28,941

plus TAMP

134

plus Carry Over from 09/10

68

BAS Virement

127

Total Allocation

29,270

Overprogramming

-1,570

SCE (R) 2010/2011

A361

Holbrooke Lane On & Off Slips

Willand & Uffculme

143

Complete

A361

Uplowman Bridge to Junction 27

Willand & Uffculme (& Tiv East if extended)

114

Programmed March 2011

SCE (R) HIGHWAY STRUCTURAL MAINTENANCE PROGRAMME (b/f from 09/10)

257

HIGHWAY STRUCTURAL MAINTENANCE PROGRAMME + SCE(R)

Total Expenditure

31,097


Appendix II

To EEC/11/36/HQ

Bridge Assessment & Strengthening Programme 2010/2011

Road No

Scheme

County Electoral Division

Scheme Total '000

State of Progress/Start Date

A386

Bideford Long Bridge cantilever strengthening

Bideford East

300

Works commenced Feb 2011

A386

Bideford Long Bridge strengthening

Bideford East

12

Final

C120

Teigngrace Causeway

Kingsteignton & Newton Abbot North

10

Investigations ongoing

B3344

Bovey Bridge cantilever footway

Bovey Tracey Rural

20

Design ongoing

C52

Otterton Bridge

Budleigh

130

Works completed July 2010

UC

Padley Bridge

Hatherleigh & Chagford

30

Works completed Oct 2010

A377

Exe Bridge South parapet strengthening

St David's and St James

334

Works ongoing

A379

Exeter Bypass Bridge

St Loyes and Topsham

250

Works ongoing

UC

Tuckmill Bridge

Honiton St Paul's

4

Completed June 2010

UC

South Wood Dry Bridge

Chudleigh Rural

20

Works completed April 2010

A399

Shutscombe Wood

South Molton Rural

220

Works ongoing

A39

Watersmeet NT retaining wall

Combe Martin Rural

34

Completed Feb 2011

C459

Snapper retaining wall

Chumleigh & Swimbridge

31

Works completed Oct 2010

UC

Woodend retaining wall

Dartmouth & Kingwear

75

Works completed Dec 2010

UC

Tavistock Old Exeter Road retaining wall

Tavistock

52

Works completed June 2010

UC

Southpool Creek retaining wall

Kingsbridge & Stokenham

83

Works ongoing

B3227

Bampton retaining wall

Tiverton West

82

Works completed Nov 2010

B3193

Teign Valley landslip

Chudleigh Rural

30

Works completed Feb 2011

UC

Shaugh Prior retaining wall

Bickleigh & Wembury

87

Completion March 2011

A361

Score Quarry landslip

Ilfracombe

73

Completed Oct 2010

UC

Hoodown Lane retaining wall

Dartmouth & Kingwear

20

Completed Sept 2010

B3205

Brixham Road retaining wall

Dartmouth & Kingwear

15

Completed Aug 2010

A396

Ashley carriageway stabilisation

Tiverton West

44

Completed Jan 2011

A39

Watersmeet wall

Combe Martin Rural

60

Completed Feb 2011

A396

Yearlstone slope stabilisation

Tiverton West

16

Investigations complete

Assessments

200

Advance Design

50

Substandard Parapets

50

Asset Management Data Collection

33

Railway Structures Assessment/Inspection

35

Traffic & signing

10

Road/rail Incursions

70

Joints & Bearings

135

Deck waterproofing

50

Rockface Management

40

Management of sub-standard structures

20

BRIDGE ASSESSMENT & STRENGTHENING PROGRAMME

Total

2,725

LTP settlement

2,848

External contribution

4

Vired to HSM

-127

BRIDGE ASSESSMENT & STRENGTHENING PROGRAMME

Total Expenditure

2,725


Appendix III

To EEC/11/36/HQ

Highway Structural Maintenance Programme 2011/2012

Road

Scheme Name

County Electoral Division

Treatment Type

Estimate '000

Commitments/contract retentions

200

A386

Whites Lane to Limers Hill

Torrington Rural

Resurfacing

287

A39

Arlington Beccot to Blackmoor Gate

Chulmleigh & Swimbridge

Resurfacing

569

A399

Stowford Cross to Four Cross Way

Chulmleigh & Swimbridge

Resurfacing

316

A386

Morrisons to A39 Rbt

Northam

Resurfacing

190

A39

Westaway to Georges Road

Barnstaple North/Combe Martin Rural

Resurfacing

208

A3124

Venton Farm to Eastlake Farm

Torrington Rural

Reconstruction

401

A3124

Beaford to Beaford Moor

Torrington Rural

Reconstruction

713

A388

Stibb Cross to Woodford Bridge

Holsworthy Rural

Resurfacing

327

A361

Gornhay

Tiverton West

Drainage

250

A377

Atkins public lane to Bonhay Road

St Davids & St James

Resurfacing

69

A377

Haven Rd to Marsh Barton Rd

Exwick & St Thomas/Alphington & Cowick

Resurfacing

400

A3052

Bowd to Core Lane

Sidmouth Sidford

Resurfacing

247

A3052

Core Lane to Sidford Cross

Sidmouth Sidford

Resurfacing

200

A3052

Burrow Lane to The Falls

Budleigh

Overlay

76

A375

Yardlands to Temple Street

Sidmouth Sidford

Resurfacing

181

A3126

Leat Street to Kennedy Way

Tiverton West

Resurfacing

210

A3052

Crealy Lodge to Farringdon Cross

Broadclyst & Whimple

Resurfacing

125

A3052

Bridge End to Berry Farm

Budleigh

Resurfacing

299

A3122

Collaton Cross towards Forces Cross

Thurlestone, Salcombe and Allington

Resurfacing

253

A382

Dyrons rbt to Halcyon Road

Newton Abbot North

Resurfacing

130

A381

Starboard Light to Luckhams Lane

Thurlestone, Salcombe and Allington

Resurfacing

77

A3122

Park & Ride Rbt to Yorke Road

Dartmouth & Kingswear

Micro Asphalt

100

A384

Riverford Bridge to Hood Bends

South Brent & Dartington

Resurfacing

34

A379

Valemoor to Teignmouth Road

Teign Estuary

Resurfacing

292

A379

Ashford

Yealmpton

Resurfacing

184

A379

Ashford (Structural work)

Yealmpton

Resurfacing

436

A379

Edmenston Jnc to Goutsford Gate

Yealmpton

Resurfacing

221

A3079

Grindhill

Okehampton Rural

Resurfacing

99

A379

Labrador Bends

Teign Estuary

Vehicle Restraint System

10

A381

Sorley Green Cross to Stumpypost Cross

Thurlestone, Salcombe and Allington

Overlay

366

Principal Roads

Local Reconstruction, Resurfacing, Overlay, Patching, Retexturing & SCRIM treatment

1,050

Surface Dressing (prin Rd named schemes)

2,650

Pre Patching and other works 12/13 Surface Dressing

600

Non-Principal Roads

Non-Principal Road Recovery Programme

3,513

Surface Dressing

6,950

Pre Patching and other works 12/13 Surface Dressing

3,700

Surface Dressing Cleaning/Design

600

Exeter Micro Asphalt Programme

250

Deep Recycling

400

All Roads

Wet/Dry accident sites:

250

Apply high skid resistance surface to approaches to railway and pedestrian crossings

170

Carriageway Condition Surveys

350

Forward Design and Investigation

300

Material Testing

200

Contract Administration and Supervision

550

Street Lighting Columns and Traffic Signals

500

Footways

1,250

Cycleways

250

Planned Patching*

3,000 *

HIGHWAY STRUCTURAL MAINTENANCE PROGRAMME

34,003

*Depending upon amount over programmed in 2010/11


Appendix IV

To EEC/11/36/HQ

Bridge Assessment & Strengthening Programme 2011/12

Road

Scheme Name

County Electoral Division

Estimate '000

A386

Bideford Long Bridge Cantilever Strengthening

Bideford East

700

C120

Teigngrace Causeway

Kingsteignton & Newton Abbot N

20

B3344

Bovey Bridge Cantilever Footway

Bovey Tracey Rural

40

A379

Exeter Bypass Bridge

St Loyes and Topsham

70

A379

Countess Wear Bridge Refurbishment and Scour Protection

St Loyes and Topsham

20

UC

Ivy Cottage Bridge No 494

Yealmpton

40

UC

St James Railway Bridge No 1085

Teignmouth

40

B3195

Lemon Bridge No 1017

Newton Abbot North

30

A361

Stoney Bridge No 2816

Braunton Rural

30

UC

Alsa Bridge No 2666

Tiverton East

30

A39

Pilton North Bridge No 2805

Barnstaple North

30

C375

Alphington Flood No 4757

Alphington & Cowick

20

Assessments

150

Retentions

5

Advance Design

50

Substandard Parapets

100

Retaining Walls

1,085

Bridge River Scour Protection

55

Asset Management Data Collection

20

Railway Structures Assessment/Inspection

50

Traffic & Signing

20

Road/rail Incursions

75

Joints & Bearings

70

Rockface Management

20

Waterproofing

10

Management of Sub-standard Structures

50

BRIDGE ASSESSMENT & STRENGTHENING PROGRAMME

2,830